SIG02 CAN FD Light
Scope
Development of a CAN FD based protocol for price-sensitive sensor and actuator networks including a conformance test plan. Application notes and network design recommendations are also in the scope of this SIG.
Chairperson
Fred Rennig, STMicroelectronics
Minutes
Title | Date | Status | Size | Published | Action |
---|---|---|---|---|---|
SIG CAN FD light | 2020-06-22 | Minutes | 1.2 MiB | 2020-08-24 | Login |
SIG CAN FD light | 2020-07-29 | Minutes | 5.6 MiB | 2020-08-24 | Login |
SIG CAN FD light | 2020-05-19 | Minutes | 2.3 MiB | 2020-08-24 | Login |
SIG CAN FD light | 2020-09-30 | Minutes | 1.0 MiB | 2020-10-08 | Login |
SIG CAN FD light | 2020-10-19 | Minutes | 1.5 MiB | 2020-11-04 | Login |
SIG CAN FD light | 2020-12-02 | Minutes | 2.7 MiB | 2020-12-15 | Login |
SIG CAN FD light | 2021-02-17 | Minutes | 1.6 MiB | 2021-03-05 | Login |
SIG CAN FD light | 2021-03-19 | Minutes | 0.9 MiB | 2021-03-26 | Login |
SIG CAN FD light | 2021-04-29 | Minutes | 4.2 MiB | 2021-05-06 | Login |
SIG CAN FD light | 2021-05-21 | Minutes | 4.0 MiB | 2021-05-28 | Login |
SIG CAN FD light | 2021-06-15 | Minutes | 10.0 MiB | 2021-07-14 | Login |
SIG CAN FD light | 2021-07-30 | Minutes | 677 KiB | 2021-08-24 | Login |
SIG CAN FD light | 2021-11-05 | Minutes | 193 KiB | 2021-11-25 | Login |
SIG CAN FD Light | 2022-01-28 | Minutes | 115 KiB | 2022-02-09 | Login |
SIG CAN FD Light | 2022-04-07 | Minutes | 652 KiB | 2022-04-25 | Login |
SIG CAN FD Light | 2022-05-13 | Minutes | 210 KiB | 2022-05-31 | Login |
SIG CAN FD Light | 2022-06-02 | Minutes | 1.8 MiB | 2022-07-05 | Login |
SIG CAN FD Light | 2022-07-15 | Minutes | 1.1 MiB | 2022-07-21 | Login |
SIG CAN FD Light | 2022-10-21 | Minutes | 618 KiB | 2022-11-16 | Login |
SIG CAN FD Light | 2022-12-08 | Minutes | 751 KiB | 2023-01-11 | Login |
SIG CAN FD Light | 2023-03-03 | Minutes | 126 KiB | 2023-03-21 | Login |
SIG CAN FD Light | 2023-03-27 | Minutes | 73 KiB | 2023-03-31 | Login |
IG04 SIG02 CAN FD Light | 2023-05-12 | Minutes | 68 KiB | 2023-05-22 | Login |
IG04 SIG02 CAN FD Light | 2023-05-26 | Minutes | 1.0 MiB | 2023-06-01 | Login |
IG04 SIG02 CAN FD Light | 2023-07-14 | Minutes | 484 KiB | 2023-07-18 | Login |
IG04 SIG02 CAN FD Light | 2023-09-28 | Minutes | 1.0 MiB | 2023-10-06 | Login |
IG04 SIG02 CAN FD light | 2023-12-01 | Minutes | 1.2 MiB | 2023-12-04 | Login |
Specifications
Title | Details | Status Size |
Published Action |
---|---|---|---|
CiA 604-2 version 0.0.1CAN FD Light Part 2: Data link layer and physical coding sub-layer conformance test plan | Descriptionn/a Keywordsn/a | WD234 KiB | 2022-04-14Login |
CiA 604-3 version 0.0.7CAN FD Light Part 3: System design recommendation | Descriptionn/a Keywordsn/a | WD712 KiB | 2023-10-23Login |
IG lower layers groups
Name | Description |
---|---|
SIG01 CAN XL | ScopeThe SIG develops and maintains the next generation of CAN data link and physical layer, providing an extra large payload, and supporting in the data-phase bit-rates exceeding 8 Mbit/s. Additionally, the SIG develops and maintains related conformance test plans. ChairmanDr. Arthur Mutter, Robert Bosch |
SIG02 CAN FD Light | ScopeDevelopment of a CAN FD based protocol for price-sensitive sensor and actuator networks including a conformance test plan. Application notes and network design recommendations are also in the scope of this SIG.
ChairmanFred Rennig, STMicroelectronics |
SIG03 EMC | ScopeDevelopment of the EMC requirements for CAN transceivers used in CAN XL networks. ChairmanMagnus-Maria Hell, Infineon Technologies |
SIG04 Long CAN FD/XL networks | ScopeRecommendation of a CAN FD and CAN XL physical layer that works for the given boundary conditions such as e.g. bit rate, topology, cable parameters, transceiver and controller characteristics, etc. This allows system designers to use CAN FD or CAN XL, even if they are not in the position to qualify their networks comprehensively. Chairmanvacant |
SIG05 3,3-V transceivers | ScopeThe SIG develops and maintains 3,3-V transceiver specifications adapted with PMA (physical medium attachment) sub-layer specifications as given in ISO 11898-2. This includes also transceivers with low-power and selective wake-up capabilities. A related conformance test plan, an interoperability test plan and an EMC specification are also in the scope. ChairmanVikas Thawani, Texas Instruments |